The Sekdoorn floating solar farm in the Netherlands is completed after a record six weeks of work. This is the fastest construction speed ever for the German company specialized in the renewables sector BayWa r.e., who worked together with its Dutch partner GroenLeven to build the power plant.
The construction was done in only six weeks and the plant can power 4,000 households.
The solar farm will have a yearly energy yield of 13.330 MWh, saving around 6,500 tons of CO2 emissions a year and powering the equivalent of 4,000 households.
Floating solar power plants are what the name suggests, solar panels mounted on a structure that floats on a body of water. The advantage is that they reduce land requirements because they can be installed in industrial pools, drinking water reservoirs and small lakes.
Continue reading… “A new floating solar farm shows that renewables can be easy”